(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Southern Resident Office foresees on-time completion for $54 million warehouse construction project [Image 2 of 2]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    A large-scale building construction site showing a multi-story reinforced concrete structure extensively covered with blue safety netting and scaffolding. A crane truck is actively positioned in the foreground, likely unloading or repositioning materials. The site appears to be in an intermediate construction phase with significant structural work still ongoing.

    The Defense Logistics Agency (DLA) warehouse construction project,
    Camp Carroll, South Korea. (FED File photo)

    IMAGE INFO

    Date Taken: 05.20.2020
    Date Posted: 05.20.2020 00:27
    Photo ID: 6215939
    VIRIN: 200520-A-FP236-002
    Resolution: 960x540
    Size: 182.54 KB
    Location: KR

    Web Views: 28
    Downloads: 4

    PUBLIC DOMAIN