A construction worker uses an electric saw to cut steel bars in the swimming pool construction site, March 16, 2012, at Cannon Air Force Base, N.M. The contractors have set a goal to have Cannon's Liberty pool completed by Memorial Day weekend.
Date Taken: | 03.16.2012 |
Date Posted: | 07.02.2012 17:59 |
Photo ID: | 617219 |
VIRIN: | 120316-F-WX664-038 |
Resolution: | 3671x2622 |
Size: | 1 MB |
Location: | CANNON AIR FORCE BASE, NEW MEXICO, US |
Web Views: | 48 |
Downloads: | 4 |
This work, Swimming pool construction on Cannon Air Force Base [Image 7 of 7], by TSgt Eboni Reece, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.