Electronics Mechanic Michael Bilski inspects fiber optic cable harnesses on an AN/TTC-59 Joint Network Node shelter.
Date Taken: | 10.28.2019 |
Date Posted: | 03.12.2020 15:50 |
Photo ID: | 6137278 |
VIRIN: | 031220-A-TB732-003 |
Resolution: | 2100x1500 |
Size: | 2.14 MB |
Location: | PENNSYLVANIA, US |
Web Views: | 54 |
Downloads: | 9 |
This work, Team refines JNN overhaul procedures, saves time [Image 3 of 3], by Thomas Robbins, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.