Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Army Corps begins to remove 5.5 million cubic yards of material from Baltimore Harbor channels [Image 3 of 4]

    Army Corps begins to remove 5.5 million cubic yards of material from Baltimore Harbor channels

    BALTIMORE, MD, UNITED STATES

    02.24.2020

    Photo by Christopher Gardner 

    U.S. Army Corps of Engineers, Baltimore District

    Map shows Brewerton Angle, Brewerton Channel and Brewerton Channel Eastern Extension, are three channels associated with Baltimore Harbor that crews under contract with the U.S. Army Corps of Engineers will be dredging as part of work that began at the end of February 2020. In all, approximately 5.5 million cubic yards of material from six channels associated with the Baltimore Harbor, ensuring continued safe navigation for vessels going in and out of the Port of Baltimore.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 02.24.2020
    Date Posted: 02.24.2020 11:15
    Photo ID: 6111849
    VIRIN: 200224-A-WZ074-001
    Resolution: 9600x5831
    Size: 7.61 MB
    Location: BALTIMORE, MD, US

    Web Views: 496
    Downloads: 4

    PUBLIC DOMAIN