(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Fort McCoy Central Issue Facility [Image 1 of 7]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The image shows a modern commercial or industrial building with a beige and brown exterior, featuring a prominent entrance canopy and large glass windows. The building appears to be a single-story structure with a taller section near the entrance, set against a partially snow-dusted lawn. The overcast winter sky and dormant grass suggest the photo was taken during late autumn or early winter.

    The Central Issue Facility (CIF) is shown Nov. 14, 2019, at Fort McCoy, Wis. The facility (building 780) was built at a cost of more than $9 million. Central Issue Facility personnel began operations at the building Sept. 14, 2015. Operating out of a 62,548-square-foot facility in building 780, CIF personnel have plenty of space to store equipment and support customers. Since 2011, the Fort McCoy CIF has been issuing Reserve Soldiers their entire Organizational Clothing and Individual Equipment needs. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)

    IMAGE INFO

    Date Taken: 11.14.2019
    Date Posted: 11.22.2019 12:50
    Photo ID: 5932228
    VIRIN: 191114-A-OK556-5403
    Resolution: 5617x3745
    Size: 2.26 MB
    Location: FORT MCCOY, WISCONSIN, US

    Web Views: 13
    Downloads: 3

    PUBLIC DOMAIN