Workers with the Defense Non-Tactical Generator and Rail Equipment Center of Anniston Army Depot, Ala., and the Fort McCoy Logistics Readiness Center’s Installation Material Maintenance Activity work on the installation’s locomotive Nov. 5, 2019, at Fort McCoy, Wis. The team of maintenance personnel completed repairs on the locomotive in time for a rail offload of Army vehicles and equipment belonging to the 389th Engineer Battalion returning from a deployment to Operation Resolute Castle overseas. The repair to the locomotive took two days to complete. Whether it was moving troops and equipment during World War II or other contingencies, or bringing in or sending out equipment and supplies for a present-day exercise, rail will always be a primary mode of transportation at the installation. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
Date Taken: | 11.05.2019 |
Date Posted: | 11.13.2019 11:13 |
Photo ID: | 5907549 |
VIRIN: | 191105-A-OK556-250 |
Resolution: | 5557x3705 |
Size: | 2.96 MB |
Location: | FORT MCCOY, WISCONSIN, US |
Web Views: | 6 |
Downloads: | 5 |
This work, Maintenance personnel repair Fort McCoy locomotive, return it to service in time for rail offload [Image 35 of 35], by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.