Honolulu District Jordan Nakagawa visits Iao Stream Flood Control Project (FCP) g the 85th meeting of the USACE CRE. The District civil works branch team asked for the committee's recommendations addressing the in-stream erosion as the primary source of sediment contributing to the degradation of near-shore coral reefs.
| Date Taken: | 07.30.2019 |
| Date Posted: | 09.13.2019 19:23 |
| Photo ID: | 5748708 |
| VIRIN: | 310718-A-YV858-160 |
| Resolution: | 4488x3125 |
| Size: | 1.25 MB |
| Location: | HAWAII, US |
| Web Views: | 25 |
| Downloads: | 2 |
This work, District collaboration with USACE Committee on River Engineering benefits local projects [Image 11 of 11], by Bryanna Poulin, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.