Contracted construction workers replace a damaged power line at Marine Corps Base Camp Lejeune, North Carolina, Sept. 6, 2019. Hurricane Dorian passed by the coast of North Carolina resulting in powerful winds and heavy rain which caused light damage to base facilities. (U.S. Marine Corps photo by Sgt. Abrey Liggins)
Date Taken: | 09.06.2019 |
Date Posted: | 09.06.2019 14:21 |
Photo ID: | 5727139 |
VIRIN: | 190906-M-OX257-0038 |
Resolution: | 3888x2592 |
Size: | 699.29 KB |
Location: | CAMP LEJEUNE, NC, US |
Web Views: | 20 |
Downloads: | 7 |
This work, Hurricane Dorian Recovery: Power Line Replacement [Image 8 of 8], by SSgt Abrey Liggins, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT