Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Lightning Inbound: VTANG Continues F-35 Prep [Image 2 of 3]

    Lightning Inbound: VTANG Continues F-35 Prep

    BURLINGTON, VT, UNITED STATES

    08.04.2019

    Photo by Ryan Campbell  

    158th Fighter Wing

    U.S. Air Force Staff Sgt. Joseph Mailloux and Master Sgt. Darren Adams, both assigned to the airfield management section of the 158th Operations Group, 158th Fighter Wing, inspect the flightline to ensure it meets all applicable requirements at the Vermont Air National Guard Base, South Burlington, Vt., Aug. 3, 2019. Inspections are done on the flightline daily as a prerequisite to flying, and are done alongside preparations ramping up ahead of F-35 Lightning IIs arriving at a future date. (U.S. Air National Guard photo by Tech. Sgt. Ryan Campbell)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 08.04.2019
    Date Posted: 08.28.2019 12:14
    Photo ID: 5655677
    VIRIN: 190804-Z-MC713-1015
    Resolution: 7057x5293
    Size: 19.68 MB
    Location: BURLINGTON, VT, US

    Web Views: 36
    Downloads: 4

    PUBLIC DOMAIN