(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    First Panels of the Calexico Border Wall Project Installed [Image 13 of 13]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Construction workers are actively building a large border wall structure using heavy equipment including a crane and a boom lift. Workers in high-visibility safety gear and hard hats are positioned at ground level and elevated in a personnel basket. The wall consists of tall vertical steel bollards being installed alongside an existing corrugated metal barrier.

    U.S. Army Corps of Engineers (USACE) contractors place rebar at footings of retaining walls on June 20, 2019. This project is for new border wall in the U.S. Border Patrol's San Diego Sector, which is funded by CBP and executed by USACE.


    Photo by Mani Albrecht
    U.S. Customs and Border Protection
    Office of Public Affairs
    Visual Communications Division

    IMAGE INFO

    Date Taken: 06.27.2019
    Date Posted: 06.27.2019 21:20
    Photo ID: 5537664
    VIRIN: 190627-H-VJ018-0013
    Resolution: 4480x6720
    Size: 6 MB
    Location: CALEXICO, US

    Web Views: 122
    Downloads: 10

    PUBLIC DOMAIN