Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Night time GBU-12 build up [Image 6 of 8]

    Night time GBU-12 build up

    TUCSON, AZ, UNITED STATES

    04.09.2019

    Photo by Airman 1st Class Kristine Legate 

    355th Wing

    U.S. Air Force Airmen from the 355th Equipment Maintenance Squadron use an MJ-1 Jammer bomb lift to place a guided bomb unit body onto a makeshift platform in a simulated deployed location on the flight line at Davis-Monthan Air Force Base, Ariz., April 9, 2019. By building an [inert] GBU-12 Paveway II in unconventional settings, the Airmen exercise their role in the joint fight by approaching every problem set with a flexible mindset that’s focused on mission success. (U.S. Air Force photo by Airman 1st Class Kristine Legate)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 04.09.2019
    Date Posted: 05.20.2019 17:09
    Photo ID: 5382686
    VIRIN: 190409-F-PV484-100
    Resolution: 4663x3331
    Size: 8.73 MB
    Location: TUCSON, AZ, US

    Web Views: 39
    Downloads: 3

    PUBLIC DOMAIN