Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Explosive Destruction System (EDS) Setup [Image 19 of 37]

    Explosive Destruction System (EDS) Setup

    UNITED STATES

    05.17.2016

    Photo by Bethani Crouch 

    Army Chemical Materials Activity

    The EDS site is not a fixed size or layout. In general, the EDS is placed within a structure which is under a slight vacuum with a pollution abatement system using carbon filtration units. This configuration ensures that any potential vapor contamination from the operation is removed by the pollution abatement system.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 05.17.2016
    Date Posted: 05.01.2019 14:49
    Photo ID: 5314141
    VIRIN: 160517-A-ID654-736
    Resolution: 1800x1350
    Size: 1.7 MB
    Location: US

    Web Views: 81
    Downloads: 6

    PUBLIC DOMAIN