The new ramp and track, made up of standard construction materials such as concrete, gravel, rail track, and spikes, is ready for use at Railway Operations on the Yermo Annex aboard Marine Corps Logistics Base Barstow, Calif., March 13.
| Date Taken: | 03.13.2019 |
| Date Posted: | 03.15.2019 15:29 |
| Photo ID: | 5181509 |
| VIRIN: | 190313-M-DU308-0112 |
| Resolution: | 5760x3840 |
| Size: | 11.87 MB |
| Location: | MARINE CORPS LOGISTICS BASE BARSTOW, CALIFORNIA, US |
| Web Views: | 26 |
| Downloads: | 3 |
This work, Rail Ops adds new heavy ramp and track [Image 3 of 3], by Laurie Pearson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.