(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Karabti San continues building eco-dome [Image 7 of 11]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Two workers are engaged in manual labor using shovels, positioned in front of a stack of white sandbags labeled 'Cal-Earth'. The person on the left is smiling and crouching while gripping a shovel with a red handle, while the second person leans forward holding a wooden-handled shovel. The setting appears to be an outdoor construction or earthbag building site.

    KARABTI SAN, DJIBOUTI

    01.03.2012

    Photo by Staff Sgt. Jarad Denton 

    Combined Joint Task Force - Horn of Africa

    Two locals break up dirt at the eco-dome construction site in Karabti San, Djibouti, Jan. 3. Once completed, the dome will stand 21 feet high.

    IMAGE INFO

    Date Taken: 01.03.2012
    Date Posted: 01.06.2012 02:41
    Photo ID: 506830
    VIRIN: 120103-F-UE958-415
    Resolution: 3304x2848
    Size: 1.2 MB
    Location: KARABTI SAN, DJ

    Web Views: 48
    Downloads: 7

    PUBLIC DOMAIN