Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    New Magic Carpet lift system officially opened with ribbon-cutting ceremony at Fort McCoy [Image 2 of 2]

    New Magic Carpet lift system officially opened with ribbon-cutting ceremony at Fort McCoy

    Fort McCoy senior leaders ride on the new Magic Carpet lift system at Whitetail Ridge Ski Area on Dec. 21, 2018, at Fort McCoy, Wis., after the official ribbon-cutting to open the lift. The project was completed in fall 2018 at a cost of $703,633 by contractor Life Cycle Construction Service Inc. of Fredericksburg, Va. The lift is conveyor-based and is 840 feet long. A ride to the top takes between three to five minutes and it can move about 1,000 people per hour. (U.S. Army Photo by Sarah Wiedenfeld, Directorate of Family and Morale, Welfare and Recreation, Fort McCoy, Wis.)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 12.21.2018
    Date Posted: 01.09.2019 16:47
    Photo ID: 5021064
    VIRIN: 181221-A-OK556-096
    Resolution: 3456x2304
    Size: 1.32 MB
    Location: FORT MCCOY, WI, US

    Web Views: 87
    Downloads: 4

    PUBLIC DOMAIN