SAN JUAN, Puerto Rico – Gregory Aponte, Juliana McMillan-Wilhoit and Jessie Petit of Task Force Power Restoration Geographical Information Systems Team display a map and graphic illustrating 72% of electric meters on the island were energized. Credit: Robert DeDeaux USACE Public Affairs.
| Date Taken: | 09.25.2018 |
| Date Posted: | 09.26.2018 10:50 |
| Photo ID: | 4776418 |
| VIRIN: | 180925-D-CR197-002 |
| Resolution: | 1000x578 |
| Size: | 197.51 KB |
| Location: | SAN JUAN, US |
| Web Views: | 46 |
| Downloads: | 6 |
This work, Task Force Power Restoration Mission [Image 3 of 3], by Hector Mosley, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.