Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    MISSION COMPLETE: Final F-16 Phase Inspection for the VTANG [Image 2 of 5]

    MISSION COMPLETE: Final F-16 Phase Inspection for the VTANG

    SOUTH BURLINGTON, VT, UNITED STATES

    08.01.2018

    Photo by 2nd Lt. Chelsea Clark 

    158th Fighter Wing

    U.S. Air Force Airman 1st Class Kevin Davis and Master Sgt. Casey Drew, aircraft maintainers assigned to the 158th Fighter Wing, look over technical data while performing a check during a phase inspection at the Vermont Air National Guard Base, August 1, 2018. Aircraft 328 was the last F-16 to undergo a phase inspection as the unit transitions to the F-35 Lightning II in fall of 2019. (U.S. Air National Guard photo by 2nd. Lt. Chelsea Clark)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 08.01.2018
    Date Posted: 09.05.2018 22:29
    Photo ID: 4703914
    VIRIN: 180801-Z-QK503-0075
    Resolution: 6584x4703
    Size: 2.76 MB
    Location: SOUTH BURLINGTON, VT, US

    Web Views: 359
    Downloads: 14

    PUBLIC DOMAIN