Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Energy managemen system forerunner of Installation of the Future [Image 1 of 2]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Energy managemen system forerunner of Installation of the Future

    UNITED STATES

    07.31.2018

    Photo by Terrance Bell  

    U.S. Army Fort Lee

    David Foltyn, a systems integrator with Johnson Controls International, monitors the computer readouts of Fort Lee’s Energy Management Control System recently. EMCS manages the HVAC systems in roughly a third of the installation’s buildings and saves millions in annual costs.

    IMAGE INFO

    Date Taken: 07.31.2018
    Date Posted: 08.13.2018 09:05
    Photo ID: 4641133
    VIRIN: 180731-A-US054-738
    Resolution: 3216x1842
    Size: 7.41 MB
    Location: US

    Web Views: 85
    Downloads: 13

    PUBLIC DOMAIN