Seabees participating in the Elevated Causeway System-Modular build drive piles with a pile hammer attached to a 200-ton Crawler crane. Active duty and reserve component Seabees assigned to Amphibious Construction Battalions (PHIBCB) 1 and 2 construct the elevated causeway at least one a year for training.
| Date Taken: | 08.03.2011 |
| Date Posted: | 08.17.2011 18:56 |
| Photo ID: | 444324 |
| VIRIN: | 110803-N-CV877-123 |
| Resolution: | 4288x2848 |
| Size: | 695.56 KB |
| Location: | VIRGINIA BEACH, VIRGINIA, US |
| Web Views: | 97 |
| Downloads: | 13 |
This work, Building the causeway [Image 17 of 17], by PO1 Jonathan Pankau, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.