Pfc. Kenneth Hornung, Marine Wing Support Squadron 171 combat engineer, uses a pre-seamer on a piece of steel during a training evolution at the MWSS-171 lot here July 28. The pre-seamer allows other pieces of steel to align with one another during assembly.
| Date Taken: | 07.28.2011 |
| Date Posted: | 08.03.2011 02:56 |
| Photo ID: | 438148 |
| VIRIN: | 110728-M-BM675-182 |
| Resolution: | 3168x4752 |
| Size: | 4.1 MB |
| Location: | AICHI, JP |
| Web Views: | 251 |
| Downloads: | 1 |
This work, Ultimate building machine proves to be construction beast [Image 5 of 5], by Sgt Marcel Brown, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.