Utuado, Puerto Rico, Mar. 6, 2018--A wide view of the New Río Abajo bridge in Utuado after months of hard work. Due to the heavy rain and flooding from Hurricane María, the previous bridge collapsed leaving a section of the community isolated from the rest of the town. This new bridge is expected to be open on March 10th for the benefit of the local residents. FEMA/Eduardo Martínez
| Date Taken: | 03.06.2018 |
| Date Posted: | 04.03.2018 14:03 |
| Photo ID: | 4257072 |
| VIRIN: | 180306-O-EM841-406 |
| Resolution: | 2042x1361 |
| Size: | 3.33 MB |
| Location: | UTUADO, PR |
| Web Views: | 28 |
| Downloads: | 9 |
This work, Last Phase Of Rebuilding In Rio Abajo Bridge [Image 3 of 3], by Eduardo Martinez, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.