Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Bill of Materials Squad

    Bill of Materials Squad

    Ponce, Puerto Rico –Randy Crapps, 1st Lt. Carlos Fabre and David Mullen of the U.S. Army Corps of Engineers Task Force Power Restoration’s Bill of Materials Squad verify previously ordered materials arriving Feb. 4 at the Port of Ponce. The Bill of Materials Squad orders and inventories all materials needed for the power restoration mission in Puerto Rico. USACE has received 28,864 poles and 2,488 miles of conductor wire to date. Approximately 7,526 poles and 617 miles of conductor wire are slated to arrive in the next 14 days. (Photo by Robert DeDeaux USACE Public Affairs)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 02.04.2018
    Date Posted: 02.07.2018 13:35
    Photo ID: 4126231
    VIRIN: 180204-A-RY318-101
    Resolution: 1750x1418
    Size: 646.42 KB
    Location: PONCE, PR

    Web Views: 47
    Downloads: 8

    PUBLIC DOMAIN