Ponce, Puerto Rico –Randy Crapps, 1st Lt. Carlos Fabre and David Mullen of the U.S. Army Corps of Engineers Task Force Power Restoration’s Bill of Materials Squad verify previously ordered materials arriving Feb. 4 at the Port of Ponce. The Bill of Materials Squad orders and inventories all materials needed for the power restoration mission in Puerto Rico. USACE has received 28,864 poles and 2,488 miles of conductor wire to date. Approximately 7,526 poles and 617 miles of conductor wire are slated to arrive in the next 14 days. (Photo by Robert DeDeaux USACE Public Affairs)
Date Taken: | 02.04.2018 |
Date Posted: | 02.07.2018 13:35 |
Photo ID: | 4126231 |
VIRIN: | 180204-A-RY318-101 |
Resolution: | 1750x1418 |
Size: | 646.42 KB |
Location: | PONCE, PR |
Web Views: | 47 |
Downloads: | 8 |
This work, Bill of Materials Squad, by Robert DeDeaux, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT