A U.S. Army Corps of Engineers contractor installs cables that run from generator to transformer at the Barceloneta Water Treatment Plant in Puerto Rico. The plant provides water to a large number of factories in the area. With power restored, factory workers will be able to return to work.
Date Taken: | 10.29.2017 |
Date Posted: | 10.31.2017 19:01 |
Photo ID: | 3917750 |
VIRIN: | 171029-A-VX563-004 |
Resolution: | 1920x1080 |
Size: | 686.04 KB |
Location: | PR |
Web Views: | 27 |
Downloads: | 4 |
This work, U.S. Army Corps of Engineers Emergency Temporary Power Team sets new record for generator installations in Puerto Rico [Image 2 of 2], by Michael Glasch, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT