The U.S. Army Corps of Engineers, Prime Power team walks through Puerto Rico’s “Centro Medicos” Power House before Installing two FEMA generators and a transformer on October 22, 2017. The Corps has partnered with the Puerto Rico Electric Power Authority, the Department of Energy and FEMA in order to establish unity of effort in the repair of the power grid, and restoring power to the island of Puerto Rico. As part of this effort the 249th Engineer Battalion assists in filling gaps where power will not be restored for a long length of time. Powering lifesaving, life sustaining, and critical infrastructure.
Date Taken: | 10.22.2017 |
Date Posted: | 10.24.2017 20:43 |
Photo ID: | 3895583 |
VIRIN: | 171022-A-AZ289-301 |
Resolution: | 5568x3712 |
Size: | 13.34 MB |
Location: | SAN JUAN, US |
Hometown: | FORT SHAFTER, HI, US |
Hometown: | HONOLULU, HI, US |
Hometown: | SCHOFIELD BARRACKS, HI, US |
Hometown: | WAHIAWA, HI, US |
Web Views: | 80 |
Downloads: | 15 |
This work, The Tenacity of Prime Power & the Resolve of Puerto Rico [Image 3 of 3], by Brigida Sanchez, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT