Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    202nd Engineering Installation Squadron maintains readiness [Image 1 of 2]

    202nd Engineering Installation Squadron maintains readiness

    ROBINS AFB, GA, UNITED STATES

    08.13.2017

    Photo by Senior Airman Caila Arahood 

    116th Air Control Wing

    U.S. Air Force Airman 1st Class Miranda Nelson, a cable and antenna specialist assigned to the 202nd Engineering Installation Squadron, 116th Air Control Wing, Georgia Air National Guard performs tower climbing training during drill weekend at Robins Air Force Base, Ga. , Aug. 13, 2017. Pole and tower climbing are important skills for cable and antenna Airmen to practice as often as possible to maintain their mission readiness domestically and overseas. (U.S. Air National Guard photo by Staff Sgt. Caila Arahood)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 08.13.2017
    Date Posted: 08.13.2017 15:09
    Photo ID: 3668697
    VIRIN: 170813-Z-PJ280-2007
    Resolution: 3736x2854
    Size: 725.71 KB
    Location: ROBINS AFB, GA, US

    Web Views: 25
    Downloads: 2

    PUBLIC DOMAIN