20170811-N-SH284-171 PUGET SOUND, Wash. (Aug. 11, 2017) USS John C. Stennis (CVN 74) sails through the fog as it transits Puget Sound past Point No Point, enroute to the Pacific Ocean. Stennis is underway for sea trials three days ahead of schedule during a planned incremental availability (PIA) at Puget Sound Naval Shipyard and Intermediate Maintenance Facility. During PIA, the ship and shipyard team accomplished the largest work package ever for an aircraft carrier in a six-month availability. (U.S. Navy photo by Mass Communication Specialist 2nd Class Vaughan Dill/Released)
| Date Taken: | 08.11.2017 |
| Date Posted: | 08.11.2017 21:05 |
| Photo ID: | 3665862 |
| VIRIN: | 170811-N-SH284-171 |
| Resolution: | 4258x2838 |
| Size: | 989.25 KB |
| Location: | BREMERTON, WASHINGTON, US |
| Web Views: | 24 |
| Downloads: | 7 |
This work, Stennis Underway After Completing PIA Early [Image 3 of 3], by Vaughan Dill, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.