Jim Cutler, electronics engineer places the rocket on the launch pad out at West Center 50 during calibration testing Jan. 12. The tests were conducted with rockets in order to test the team's ability to track fast-paced missiles.
Date Taken: | 01.12.2017 |
Date Posted: | 01.26.2017 19:28 |
Photo ID: | 3125181 |
VIRIN: | 170112-A-UY615-710 |
Resolution: | 4000x6000 |
Size: | 7.89 MB |
Location: | WHITE SANDS MISSILE RANGE, NEW MEXICO, US |
Web Views: | 38 |
Downloads: | 6 |
This work, Jim Cutler, electronics engineer places the rocket on the launch pad [Image 2 of 2], by Adriana Salas, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.