Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Second wind turbine brings Tooele Army Depot closer to net zero energy

    Second wind turbine brings Tooele Army Depot closer to net zero energy

    SACRAMENTO, CA, UNITED STATES

    03.22.2016

    Photo by John Prettyman  

    U.S. Army Corps of Engineers, Sacramento District

    A second wind turbine towers nearly 300 feet above the nearby Stirling solar array at Tooele Army Depot, Utah, March 22, 2016. The $6.5 million wind turbine project is scheduled to be complete later this year and begin generating power. The 1.5 megawatt solar array, consisting of 429 Stirling engine solar dishes spread across 15 acres, is scheduled to be fully operational in 2017. (U.S. Army photo by John Prettyman/released)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 03.22.2016
    Date Posted: 01.23.2017 20:13
    Photo ID: 3117643
    VIRIN: 160322-A-AN535-027
    Resolution: 6000x3375
    Size: 2.18 MB
    Location: SACRAMENTO, CA, US

    Web Views: 96
    Downloads: 14

    PUBLIC DOMAIN