Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    First panel installed at Eglin’s solar farm [Image 5 of 6]

    First panel installed at Eglin’s solar farm

    EGLIN AIR FORCE BASE, FL, UNITED STATES

    01.18.2017

    Photo by Samuel King Jr.              

    96th Test Wing

    Mike Burrows, Gulf Power, Ed Feo, Coronal Development Services and Col. Craig Johnson, 96th Test Wing, simultaneously turn the wrench to install a solar panel at a small ceremony Jan. 18 at Eglin Air Force Base, Fla. Leaders from the three project partners installed the first of the eventual 375,000 solar panels that will be located on the 240-acre site. (U.S. Air Force photo/Samuel King Jr.)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 01.18.2017
    Date Posted: 01.20.2017 14:22
    Photo ID: 3110157
    VIRIN: 170118-F-oc707-604
    Resolution: 3000x1822
    Size: 2.56 MB
    Location: EGLIN AIR FORCE BASE, FL, US

    Web Views: 12
    Downloads: 5

    PUBLIC DOMAIN