As part of the construction contract, a new elevator was installed inside the new Mosul Airfield tower.
| Date Taken: | 08.14.2006 |
| Date Posted: | 06.28.2011 14:40 |
| Photo ID: | 27750 |
| Resolution: | 875x1333 |
| Size: | 171.07 KB |
| Location: | MOSUL, IQ |
| Web Views: | 105 |
| Downloads: | 25 |
This work, Mosul Airfield Tower Nears Completion [Image 16 of 16], by SFC Steven Petibone, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.