Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    MCAS Beaufort runway open, maintenance complete [Image 2 of 4]

    MCAS Beaufort runway open, maintenance complete

    MARINE CORPS AIR STATIN BEAUFORT, SC, UNITED STATES

    03.21.2016

    Photo by Lance Cpl. Kayla Rainbolt 

    Marine Corps Air Station Beaufort

    Runway 05/23 on Marine Corps Air Station Beaufort opened Aug. 2 after completing maintenance to the landing surfaces. This maintenance increases the integrity of the runway surfaces and ensures our aircraft will operate on the most stable and structurally efficient runway as we continue our mission of maintaining a high state of readiness to support current and emerging threats.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 03.21.2016
    Date Posted: 08.02.2016 13:22
    Photo ID: 2762754
    VIRIN: 160321-M-OM791-020
    Resolution: 5760x3840
    Size: 1.36 MB
    Location: MARINE CORPS AIR STATIN BEAUFORT, SC, US

    Web Views: 26
    Downloads: 6

    PUBLIC DOMAIN