Pfc. Christian Cruz, automated logistical specialist, dedicated two weeks towards GCSS-A synchronization, ensuring all STAMIS data were transferred correctly.
| Date Taken: | 02.29.2016 |
| Date Posted: | 03.22.2016 16:25 |
| Photo ID: | 2480207 |
| VIRIN: | 160229-A-ZZ999-001 |
| Resolution: | 480x640 |
| Size: | 111.66 KB |
| Location: | HAWAII, US |
| Web Views: | 29 |
| Downloads: | 2 |
This work, Eng. BN increases mission capability, ensures greater predictability with GCSS-A [Image 2 of 2], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.