160113-N-ZZ999-001 PEARL HARBOR (Jan. 12, 2016) - Steelworker 1st Class Jesse Hamblin and Hospital Corpsman James Aldridge, assigned to Underwater Construction Team (UCT) 2, attached a base plate to a pile, which will provide a stable platform for the installation of a new pile-jacket system. UCT 2’s Construction Dive Detachment Alfa (CDDA) is conducting pier repair on Joint Base Pearl Harbor Hickam to help prolong Third Fleet assets. CDDA is on the first stop of their deployment, where they are conducting inspection, maintenance, and repair of various underwater and waterfront facilities in support of the Pacific Fleet. (U.S. Navy photo by Construction Mechanic 3rd Class Ben McCallum/Released)
Date Taken: | 01.13.2016 |
Date Posted: | 01.19.2016 11:20 |
Photo ID: | 2361769 |
VIRIN: | 160113-N-ZZ999-001 |
Resolution: | 3264x2448 |
Size: | 495.21 KB |
Location: | PEARL HARBOR, HI, US |
Web Views: | 17 |
Downloads: | 7 |
This work, UCT 2 conducts pier repair [Image 2 of 2], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT