Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Civil engineering projects: From beginning to end [Image 5 of 5]

    Civil engineering projects: From beginning to end

    F.E. WARREN AFB, WY, UNITED STATES

    11.10.2015

    Photo by Senior Airman Jason Wiese 

    90th Missile Wing

    Staff Sgt. Justin Morrison, 90th Civil Engineer Squadron Pavements and Equipment, smooths out concrete poured outside the Chadwell Dining Facility on F.E. Warren Air Force Base, Wyo., Nov. 10, 2015. The concrete replaced gravel that pedestrians often kicked into the roads, posing wear and tear issues for the road. (U.S. Air Force photo by Senior Airman Jason Wiese)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 11.10.2015
    Date Posted: 12.07.2015 14:14
    Photo ID: 2318591
    VIRIN: 151110-F-BR137-038
    Resolution: 4288x2848
    Size: 7.5 MB
    Location: F.E. WARREN AFB, WY, US

    Web Views: 6
    Downloads: 4

    PUBLIC DOMAIN