Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    119th keeps up with base maintenance [Image 2 of 4]

    119th keeps up with base maintenance

    Airman 1st Class Calvin Nordsletten, of the 119th Civil Engineer Squadron prepares to fill in low areas of a fresh concrete pour using a shovel at the North Dakota Air National Guard Base, Fargo, N.D., Sept. 21, 2015. The Airmen are repairing and replacing damaged and weathered areas as a continual process of base maintenance. (U.S. Air National Guard photo by Senior Master Sgt. David H. Lipp/Released)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 09.21.2015
    Date Posted: 09.21.2015 13:53
    Photo ID: 2187327
    VIRIN: 150921-Z-WA217-010
    Resolution: 4512x3008
    Size: 7.26 MB
    Location: FARGO, ND, US

    Web Views: 6
    Downloads: 2

    PUBLIC DOMAIN