Chief Equipment Operator James Igoe from Construction Dive Detachment Alpha, part of Underwater Construction Team (UCT) 2 out of Port Hueneme, Calif., gives the “ready” signal during an annual maintenance and repair procedure at the Sierra piers on Joint Base Pearl Harbor-Hickam. The Underwater Construction Team provides a capability for construction, inspection, repair, and maintenance of ocean facilities in support of Naval and Marine Corps operations. (U.S. Navy Photo by Mass Communication Specialist 3rd Class Johans Chavarro/Released)
Date Taken: | 11.21.2014 |
Date Posted: | 01.09.2015 21:32 |
Photo ID: | 1717518 |
VIRIN: | 141121-N-IU636-131 |
Resolution: | 2800x2000 |
Size: | 1.41 MB |
Location: | PEARL HARBOR, HI, US |
Web Views: | 6 |
Downloads: | 2 |
This work, Annual maintenance and repair procedure, by PO2 Johans Chavarro, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT