A group of contractors work on the installation of a switch gear box in order to make final preparations on the East Liberty power plant on the Victory Base Complex on Dec. 4.
| Date Taken: | 12.04.2008 |
| Date Posted: | 02.11.2012 05:06 |
| Photo ID: | 137304 |
| VIRIN: | 081219-A-5510S-002 |
| Resolution: | 3872x2592 |
| Size: | 1.2 MB |
| Location: | BAGHDAD, IQ |
| Web Views: | 153 |
| Downloads: | 19 |
This work, Camp Victory cranks up power, cuts the noise [Image 3 of 3], by Michel Sauret, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.