(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    D-M hosts 16.4 MW solar array ribbon cutting ceremony [Image 3 of 6]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    A man in a dark suit and sunglasses speaks at a wooden podium with a microphone at an outdoor ceremony. Three flags — the United States flag, the Arizona state flag, and what appears to be a military or government branch flag — are displayed on stands behind him. The backdrop features a large solar panel installation enclosed by a chain-link fence, suggesting this is a dedication or ribbon-cutting event for a solar energy facility.

    TUCSON, ARIZONA, UNITED STATES

    02.13.2014

    Photo by Airman 1st Class Chris Massey 

    355th Wing

    Bob Powell, North America, SunEdison Solar Energy president, speaks at the photovoltaic solar array ribbon cutting ceremony at Davis-Monthan Air Force Base, Ariz., Feb. 13, 2014. In 2010, Davis-Monthan entered into an agreement with SunEdison, LLC to design, finance, build, operate and maintain the array on 170 acres of underutilized land at two locations on base. (U.S. Air Force Photo by Airman 1st Class Chris Massey/Released)

    IMAGE INFO

    Date Taken: 02.13.2014
    Date Posted: 02.14.2014 14:10
    Photo ID: 1167758
    VIRIN: 140213-F-ZT877-116
    Resolution: 3184x2120
    Size: 1.26 MB
    Location: TUCSON, ARIZONA, US

    Web Views: 47
    Downloads: 2

    PUBLIC DOMAIN