Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Bridge prepares to move [Image 3 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Bridge prepares to move

    NAVAL SUPPORT ACTIVITY BAHRAIN, BAHRAIN

    01.19.2014

    Photo by Petty Officer 1st Class Steven Smith 

    U.S. Naval Support Activity Bahrain

    A tied arch bridge, known as the flyover bridge, was prepared to move into place over the Khalifa Bin Salman Causeway connecting Naval Support Activity (NSA) Bahrain to the U.S. Navy port facility (NSA II). The 122.5-meter-long, 21.4-meter-high, 2,650-metric ton bridge was constructed on NSA II, and will be driven across the causeway on self-propelled modular trailers (SPMT), and set in place on pre-constructed abutments. The greatest benefit of this process allows Bahrain traffic to be disrupted for hours as opposed to months it would have taken to build the bridge in place. (U.S. Navy photo by Mass Communication Specialist 1st Class Steve Smith/Released)

    IMAGE INFO

    Date Taken: 01.19.2014
    Date Posted: 01.29.2014 12:37
    Photo ID: 1157736
    VIRIN: 140119-N-ZI300-008
    Resolution: 5616x3744
    Size: 1.69 MB
    Location: NAVAL SUPPORT ACTIVITY BAHRAIN, BH

    Web Views: 62
    Downloads: 6

    PUBLIC DOMAIN