(e.g. yourname@email.com)

Forgot Password?

    Or login with Facebook

    Breakwater construction in Timor-Leste [Image 2 of 4]

    Breakwater construction in Timor-Leste

    DILI, EAST TIMOR

    10.19.2013

    Courtesy Photo

    Underwater Construction Team Two

    Builder 2nd Class Christopher Farmer, assigned to Underwater Construction Team (UCT) Two, works with a member of the Timor-Leste Defense Force to place core material during construction of a rubble mound breakwater. Seabees from UCT Two are working with Timor-Leste's MPU, Australia's Defence Cooperation Program, the Timor-Leste Defense Force and Seabees from NMCB 3 to construct a rubble mound breakwater and floating small boat pier. The small boat pier will enhance the MPU's ability to launch and recover small boats. (Photo by Petty Officer 2nd Class Matt Dawson)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 10.19.2013
    Date Posted: 10.31.2013 17:09
    Photo ID: 1044112
    VIRIN: 131019-N-ZZ999-001
    Resolution: 2592x1936
    Size: 1.61 MB
    Location: DILI, TL 

    Web Views: 134
    Downloads: 8
    Podcast Hits: 0

    PUBLIC DOMAIN