Workers at Swan Island near Portland, Ore., prepare the spillway weir Feb. 16 for movement up the lower Columbia River to Ice Harbor Lock and Dam on the lower Snake River. It took three days to transport the five-story-tall, 1.7 million-pound fish passage structure. (U.S. Army Corps of Engineers photo)
| Date Taken: | 02.11.2005 |
| Date Posted: | 11.24.2026 10:55 |
| Photo ID: | 10115113 |
| VIRIN: | 050212-A-CE999-1010 |
| Resolution: | 2159x1632 |
| Size: | 631.55 KB |
| Location: | WALLA WALLA, WASHINGTON, US |
| Web Views: | 14 |
| Downloads: | 0 |
This work, Preparing the Spillway Weir for movement [Image 402 of 402], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
No keywords found.

