U.S. Navy Quartermaster Petty Officer 3rd Class Logan Shelton, assigned to the Wasp-class amphibious assault ship USS Bataan (LHD 5), operates a computer program during a bridge training simulation to ensure proper communication between all equipment and teams in regard to current position and bearing on Naval Station Norfolk, Nov. 23, 2026. Having contingencies and redundancies in major systems ensures that a malfunction in one part of the ship does not lead to a total operational breakdown. Bataan is currently undergoing regularly scheduled maintenance in the General Dynamics National Steel and Shipbuilding Company (NASSCO) shipyard in Norfolk, Virginia. (U.S. Navy photo by Mass Communication Specialist Seaman Perry Owens)
| Date Taken: | 11.23.2026 |
| Date Posted: | 11.25.2026 09:41 |
| Photo ID: | 10113837 |
| VIRIN: | 261123-N-IR361-8754 |
| Resolution: | 4430x3121 |
| Size: | 989.37 KB |
| Location: | NORFOLK, VIRGINIA, US |
| Web Views: | 9 |
| Downloads: | 0 |
This work, Preparing the Bridge Crew of USS Bataan (LHD 5) [Image 5 of 5], by SN Perry Owens, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.