Members of the Division of Public Works use a John Deere backhoe loader to dig a precise trench for utility upgrades at the Main Gate at Devens Reserve Forces Training Area, Mass., Oct. 27. The project created a more permanent patch on a communications trench and smoothed access to the installation to support regional training units.
| Date Taken: | 10.27.2026 |
| Date Posted: | 11.18.2026 14:06 |
| Photo ID: | 10103404 |
| VIRIN: | 261027-D-HX738-9977 |
| Resolution: | 5472x3648 |
| Size: | 3.84 MB |
| Location: | DEVENS, MASSACHUSETTS, US |
| Web Views: | 7 |
| Downloads: | 0 |
This work, Digging Deep: Utility Infrastructure Upgrades Underway [Image 3 of 3], by John Quinn, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.