Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Biscayne Bay Coastal Wetlands Project (BBCW) B-Roll

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    CUTLER BAY, FLORIDA, UNITED STATES

    12.08.2025

    Video by Brigida Sanchez 

    U.S. Army Corps of Engineers, Jacksonville District

    The Biscayne Bay Coastal Wetlands Project (BBCW) is part of the Comprehensive Everglades Restoration Plan (CERP) that aims to restore the quality, quantity, timing and distribution of water within the Greater Everglades Ecosystem. The purpose of the BBCW project is to rehydrate coastal wetlands and reduce abrupt point-source freshwater discharge to Biscayne Bay and Biscayne National Park that are physiologically stressful to fish and benthic invertebrates in the bay near canal outlets. The BBCW project will restore wetland and estuarine habitats, and divert an average of 59 percent of the annual coastal structure discharge into freshwater and saltwater wetlands instead of direct discharges to Biscayne Bay and Biscayne National Park. (U.S. Army video by Brigida I. Sanchez)

    VIDEO INFO

    Date Taken: 12.08.2025
    Date Posted: 12.09.2025 06:12
    Category: B-Roll
    Video ID: 989375
    VIRIN: 251208-A-AZ289-1001
    Filename: DOD_111425830
    Length: 00:04:13
    Location: CUTLER BAY, FLORIDA, US

    Video Analytics


    Downloads: 1
    High-Res. Downloads: 1

    PUBLIC DOMAIN