Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Louisville VA Medical Center Construction Update

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    LOUISVILLE, KENTUCKY, UNITED STATES

    04.23.2025

    Video by Michael Maddox 

    U.S. Army Corps of Engineers, Louisville District

    Terry Durham, area engineer for the Louisville VA Medical Center construction project, shares an update on how construction is coming along April 23, 2025.

    The Louisville VA Medical Center is a $930 million project that includes the construction of a new 910,115 square-foot medical center, parking structures, a 42,205 square-foot central utility plant, roadways, sidewalks, and other site improvements.

    The new 104-bed, full-service hospital will provide world-class healthcare for more than 45,000 Veterans in Kentucky and Southern Indiana by integrating modern patient-centered care concepts to provide the best possible care for Veterans.

    Construction is anticipated to be complete in 2026.

    VIDEO INFO

    Date Taken: 04.23.2025
    Date Posted: 05.02.2025 09:21
    Category: B-Roll
    Video ID: 960729
    VIRIN: 250423-A-GI410-1002
    Filename: DOD_110963603
    Length: 00:05:15
    Location: LOUISVILLE, KENTUCKY, US

    Video Analytics


    Downloads: 3
    High-Res. Downloads: 3

    PUBLIC DOMAIN