Terry Durham, area engineer for the Louisville VA Medical Center construction project, shares an update on how construction is coming along April 23, 2025.
The Louisville VA Medical Center is a $930 million project that includes the construction of a new 910,115 square-foot medical center, parking structures, a 42,205 square-foot central utility plant, roadways, sidewalks, and other site improvements.
The new 104-bed, full-service hospital will provide world-class healthcare for more than 45,000 Veterans in Kentucky and Southern Indiana by integrating modern patient-centered care concepts to provide the best possible care for Veterans.
Construction is anticipated to be complete in 2026.
Date Taken: | 04.23.2025 |
Date Posted: | 05.02.2025 09:21 |
Category: | B-Roll |
Video ID: | 960729 |
VIRIN: | 250423-A-GI410-1002 |
Filename: | DOD_110963603 |
Length: | 00:05:15 |
Location: | LOUISVILLE, KENTUCKY, US |
Downloads: | 3 |
High-Res. Downloads: | 3 |
This work, Louisville VA Medical Center Construction Update, by Michael Maddox, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.