Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Unified Command performs controlled demolition, precision cutting

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    BALTIMORE, MD, UNITED STATES

    05.13.2024

    Video by Christopher Rosario 

    U.S. Army Corps of Engineers, Baltimore District

    Salvors with the Unified Command perform a controlled demolition, precision cutting of section 4 of the Francis Scott Key Bridge that sits on the port side of the bow of the M/V DALI, May 13, 2024, Key Bridge Response 2024.

    Debris and wreckage removal is ongoing in support of a top priority to safely and efficiently open the Fort McHenry Channel.

    (U.S. Army Corps of Engineers photo by Christopher Rosario)

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 05.13.2024
    Date Posted: 05.14.2024 10:11
    Category: B-Roll
    Video ID: 923331
    VIRIN: 240513-A-ZT698-7081
    Filename: DOD_110304962
    Length: 00:03:16
    Location: BALTIMORE, MD, US

    Video Analytics


    Downloads: 39
    High-Res. Downloads: 39

    PUBLIC DOMAIN