Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Buffalo District Floating Plant Drilling at Barcelona Harbor B-Roll

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    WESTFIELD, NY, UNITED STATES

    04.23.2024

    Video by Andre Hampton 

    U.S. Army Corps of Engineers, Buffalo District

    The USACE Buffalo District Floating Plant crew has completed drilling and filled preliminary holes in the sheet piling cells at Barcelona Harbor, Westfield, New York, April 23, 2024 . Data has been collected, delivered to our design team, and they are going through the findings to determine if there is a need for future grouting of the cells to fill any void space underneath and ensure the stabilization of the structure. (U.S. Army Photo by Andre' M. Hampton)

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 04.23.2024
    Date Posted: 05.09.2024 11:29
    Category: B-Roll
    Video ID: 922757
    VIRIN: 240506-A-VR700-9002
    Filename: DOD_110294878
    Length: 00:01:21
    Location: WESTFIELD, NY, US

    Video Analytics


    Downloads: 1
    High-Res. Downloads: 1

    PUBLIC DOMAIN