Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Red Hill Bulk Fuel Storage Facility, Adit 1 Pipe Cutting and Air Gap

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    Adit 1 Pipe Cutting and Air Gap

    13Mar: Cutting the pipeline connecting Joint Base Pearl Harbor-Hickam to the
    Red Hill Bulk Fuel Storage Facility at Adit 1.

    18Mar: Air gap created after the cutting process was completed.

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 03.13.2024
    Date Posted: 03.27.2024 18:33
    Category: B-Roll
    Video ID: 917228
    VIRIN: 240313-N-IS471-2001
    Filename: DOD_110203652
    Length: 00:00:33
    Location: HI, US

    Video Analytics


    Downloads: 3
    High-Res. Downloads: 3

    PUBLIC DOMAIN