B-roll of a site visit to a p-optimal wetland with the U.S. Army Corps of Engineers, the U.S. Geological Survey, the Environmental Protection Agency, LimnoTech and the City of Defiance, discussing progress made in the project, Defiance, Ohio, March 18, 2024. The project is a $5 million Great Lakes Restoration Initiative project that aims to reduce nutrient load to Great Lakes tributaries through the creation of wetlands. (U.S. Army video by Ryan Campbell
Date Taken: | 03.18.2024 |
Date Posted: | 03.20.2024 13:42 |
Category: | B-Roll |
Video ID: | 916421 |
VIRIN: | 240318-A-MC713-2001 |
Filename: | DOD_110191688 |
Length: | 00:01:35 |
Location: | DEFIANCE, OHIO, US |
Downloads: | 3 |
High-Res. Downloads: | 3 |
This work, Defiance, Ohio P-Optimal Wetland Project Site, by MSgt Ryan Campbell, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.