The official defueling of the Red Hill Storage facility has begun, leading to the eventual closing of Red Hill, and the restoration of Oahu's Aquaphor.
| Date Taken: | 10.16.2023 |
| Date Posted: | 10.18.2023 04:52 |
| Category: | Package |
| Video ID: | 900773 |
| VIRIN: | 231016-F-CG016-2847 |
| Filename: | DOD_109944707 |
| Length: | 00:01:00 |
| Location: | JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US |
| Downloads: | 3 |
| High-Res. Downloads: | 3 |
This work, Defueling Red Hill Begins, by SSgt Elizabeth Taranto, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.